Jiangsu Banshan Power Generation Co., Ltd.

Views:

 The planned capacity of Bishan Power Plant is 3200MW. The company adopts ultra-supercritical power generation technology (the main parameters are 25MPa/600 C/600 C) and two-cylinder two-exhaust steam turbine technology, and simultaneously constructs flue gas desulfurization and denitrification devices, which represent the international advanced level and are one of the most efficient and clean coal-fired power generation projects in China.

The project of Bishan Power Plant has purchased one set of UNT-ECS2000 auxiliary power monitoring system, 32 UNT-CMII communication managers, more than 1300 UNT-PCK intelligent PC measuring and controlling devices and UNT-MMI motor protectors. Among them, the communication network adopts the way of double network redundancy. The integrated protection equipment of high and low pressure, such as PC section of steam turbine, PC section of boiler and common section of two units, is brought into the electric monitoring system. Through the use of our company's auxiliary electrical monitoring system, greatly improve the automation of power plant operation, to ensure the economic, safe, reliable and stable operation of auxiliary power system.

After more than ten years of operation in Banshan Power Plant, the user feedback device runs steadily and functions normally. Considering the service life of electronic equipment, users have carried out product upgrading in recent years. For the recognition of the company's products, users continue to choose our products.

Equipment applications:

Subsidiary Power Monitoring System: UNT-ECS2000 1 Sets

Communication Manager: UNT-CMII 32

Protective measurement and control device:

UNT-MMI 858; UNT-PCK 340; UNT-PT 26; UNT-LOGO 17, etc.